What is the typical Commercial project timeline?

YouTube video

Concrete floors vary from a couple days to five days on the installation side per mobilization which means that on a construction site if they give us 5,000 square feet of a 70,000 square foot job at a time, we’ll typically turn that over back to them in five days. We can do obviously much more than that, we’ve done 30,000 square feet in two weeks, prep to coatings. It depends on the circumstances of the job, so it varies widely, but we adapt to what the customers needs are and what the needs of the construction site are. So we’ll come in and do whatever has to be done in the time allowed. Most typically I would say five days is the turnover for a typical residence flooring system from prep to finish.